Below is a list of plenary CCWG-Accountability documents (documents that have been circulated to or developed by the the full CCWG-Accountability group).

For sub-group documents, please refer to the following pages : 

Please note that these documents are interim work products and are not considered final unless noted otherwise.  

 

First Draft Report (published on 4 May 2015):


Second Draft Report (published on 12 September):  

Third Draft Report (published 


Translations are available on the following page: Translated Resources 

 

Title

Date

DOC/PPT

PDFStatus
AOC N/ACCWG-Comments on Draft New ICANN Articles of Incorporation.pdf 
Proposed Revisions to ICANN AoI N/AProposed Revisions to ICANN AoI.pdf 
FY17 CCWG Budget N/APCST Status on FY17 CCWG budget - 20Jun16 v1 0.pdf 
ICANN-56 CCWG Travel Support N/ACCWG-ACCT Member Travel Support - updated 7 June.pdf 
CCWG-WS2 and ATRT3 CCWG-WS2 and ATRT3CCWG-WS2 and ATRT3 
Bylaws-Redline N/ABylaws - Redline - May 26 to May 25.pdf 
Draft Comments for ICANN Public Consultation

 

 

 

CCWG CCWG-Comments on Draft New ICANN BylawsV5-Finalclean.docx

N/A

N/A

CCWG CCWG-Comments on Draft New ICANN BylawsV5-Finalclean.pdf

CCWG-DraftCommentsForICANNPublicConsultationV2.0-Clean.pdf 

CCWG-DraftCommentsForICANNPublicConsultationV1.0-Clean.pdf

 
Bylaws Issues discussed at CCWG Meeting #93 CCWG-ACCT-bylaws-IssuesPresentation V1.0BT(1).pptxCCWG-ACCT-bylaws-IssuesPresentation V1.0BT(1).pdf 
Draft Bylaws reviewed by Lawyers 

ICANN - Bylaws - April Update Draft - 513 pm 20 April.docx

 

N/A

N/A

ICANN - Bylaws - April Update Draft - 513 pm 20 April.pdf

ICANN Bylaws - Redline - April 20 vs April 7.pdf

CCWG Proposal_ICANN Bylaws (April 20_2016)_Mapping.pdf

 
Explanation of Grandfather Agreements Explanation of Grandfathering Provisions at Section 1.docExplanation of grandfathered agreements (00788389xA3536).pdf 
Draft Questions/Answers for Bylaws Coordination Group

 

 

 

CCWG Pending Questions for Bylaws Coordination Group - Post April 14 - Answers to some remaining questions V1.docx

CCWG Pending Questions for Bylaws Coordination Group - Answers from April 12V4.docx

CCWG Pending Questions for Bylaws Coordination Group - Post April 14 - Answers to some remaining questions V1.pdf

CCWG Pending Questions for Bylaws Coordination Group - Answers from April 12V4.pdf

 
Resolving Pending Issues Slide Deck

 

 

0412presentation.pptx

0411presentation.pptx

0412presentation.pdf

0411presentation.pdf

 
CCWG Completed Bylaws Coordination Group N/ACCWG Completed Bylaws Coordination Group.pdf 
CCWG Open Bylaws Issues N/ACCWG Open Bylaws Issues 11 April 2016 Some Proposed Answers.pdf 
CCWG Responses to Bylaws Questions

 

 

N/A

N/A

CCWG Response -Bylaws-Questions 7April2016V3-ForLawyers.pdf

CCWG Response-Bylaws-Questions 6Apr16V2.pdf

 
Bylaws Reference Map N/ACCWG Proposal - ICANN Bylaws Reference Map (April 5, 2016).pdf 
CCWG and Bylaws Timeline CCWG and Bylaws timeline V0.5-BT.pptxCCWG and Bylaws timeline V0.5-BT.pdf 
Issues List for Bylaws Issues List for Bylaws Coordination Group 2 April 2016.docxIssues List for Bylaws Coordination Group 2 April 2016.pdf 
Draft Bylaws DRAFT-NEW-ICANN-BYLAWS-vers2APR.docxDRAFT-NEW-ICANN-BYLAWS-vers2APR.pdf 
Draft Bylaws Comparison (redline)

 

 

 

Redline - April 2 Draft Bylaws compared to Current Bylaws v2

N/A

Redline - April 2 Draft Bylaws compared to Current Bylaws

 
CCWG Working Session Slides N/A

CCWG Working Session Slides - 10 March.pdf

CCWG-ACCT_Participation-Data_9Mar.pdf

Letter for Board Transmittal - 10 March 2016.pdf

Call for Volunteers WS2.pdf

 
Marrakech F2F Slides CCWG-Marrakech-F2F-4March-updated2.pptxCCWG-Marrakech-F2F-4March-updated2.pdf 
Poll Results

 

 

Poll Results_CCWG 23 February_updated1830UTC.docx

Poll Results_ CCWG 23 February.docx

Poll Results_CCWG 23 February_updated1830UTC.pdf

Poll Results_ CCWG 23 February.pdf

 
Paragraph 72 text Paragraph 72.pptxParagraph 72.pdf 
Recommendation 4 (from ICANN) 

Sample Guidelines for Due Diligence in Board Removal Discussions.doc

Indemnification for Director Removal Participation.docx

Sample Guidelines for Due Diligence in Board Removal Discussions.pdf

Indemnification for Director Removal Participation.pdf

 
Board Remarks on HR, IRP and Community IRP Board remarks on Human Rights, IRP and Community IRP.docxBoard remarks on Human Rights, IRP and Community IRP.pdf 
Recommendation 6 - Human Rights

 

HR_dormant.pptx

HR_dormant.pdf

 
Defending and Protecting Work Stream 2 AJed 20151026 Items for Consideration in Work Stream 2.docxAJed 20151026 Items for Consideration in Work Stream 2.pdf 
Engagement N/ACCWG-Engagement (1).pdf 
Models Comparison Tool CCWG-ModelsComparisonTool-DRAFT.docxCCWG-ModelsComparisonTool-DRAFT.pdf 
Community Decision Dublin breakout - Community Decision.docxDublin breakout _ Community Decision.pdf 
Terms of Reference for Breakouts in Dublin Terms of Ref for CCWG Breakouts.docxTerms of Ref for CCWG Breakouts.pdf 
Scorecard

 

CCWGACCT Scorecard.docxCCWGACCT Scorecard.pdf 
Timeline

 

 

 

 

 

Timeline next steps_19 Nov.docx

N/A

N/A

Project Management - scenarios v1.3.pptx

Project Management - scenarios v1.1.pptx

Timeline next steps_19 Nov.pdf

CCWG Timeline.pdf

Potential Timeline.pdf

Project Management - scenarios v1.3.pdf

Project Management - scenarios v1.1.pdf

 
Areas of agreement
 

N/A

Seeking Community Agreement - 24 September.pdf 
Slides for Call #55
 N/ATo Dublin and beyond.pdf 
Documents from LA F2F

 

 

 

 

 

 

 

 

LA F2F Summary.pptx

N/A

CCWG - Breakout Instructions v1.pptx

N/A

legal-analysis.pptx

CCWG - Thomas Set Up Slides.pptx

CCWG LA Intro.pptx

Call Slides _ Meeting #54.pptx

LA F2F Summary.pdf

CCWG - LA2015_changes.pdf

CCWG - Breakout Instructions v1.pdf

IRP Slide.pdf

legal-analysis.pdf

CCWG - Thomas Set Up Slides.pdf

CCWG LA Intro.pdf

Call Slides _ Meeting #54.pdf

 
CCWG Narrative Document
   https://docs.google.com/document/d/1O2fYAP3IlbvqdQ0zmrdqpE4F2rSs1J3MmcoF-QaG190/edit?usp=sharingN/Ain Draft (see link)
Comments from Ira Magaziner
 ICANN response_Ira Magaziner.docxICANN response_Ira Magaziner.pdf(info) Shared with CCWG
Trends from 2nd Public Comment
 2nd-draft-CCWG trends-v4.pptx2nd-draft-CCWG trends-v4.pdf(tick) Shared on CCWG ACCT Meeting #53 (15 September @ 06:00 UTC)
Proposed XPLANE Visual Summary

 

 

XPL_CCWG Proposal_Visual Summary_FINAL.pptx

CCWG-Proposal_XPLANE-Visual Summary_DRAFT.pptx

XPL_CCWG Proposal_Visual Summary_FINAL.pdf

CCWG-Proposal_XPLANE-Visual Summary_DRAFT.pptx

(info) Proposed Draft presented at CCWG Acct Meeting #47

 

Executive Summary

 

 

 

 

 

 

 

Executive Summary_3107_v1_redline_sbt.docx

Executive Summary_3007_v2.docx

Executive Summary_3007_v2_redline.docx

Executive Summary_2807_v4.docx

Executive Summary_3007_redline.docx

Executive Summary_2807_v2.docx

Executive Summary_2807.docx

Executive Summary_3107_v1_redline_sbt.pdf

Executive Summary_3007_v2.pdf

Executive Summary_3007_v2_redline.pdf

Executive Summary_2807_v4.pdf

Executive Summary_3007_redline.pdf

Executive Summary_2807_v2.pdf

Executive Summary_2807.pdf

 

(info) Circulated on 30 July after CCWG Acct Meeting

 

 

 

 

(info) Circulated on 28 July. New addition for this 2nd draft.

Accountability Mechanisms

 

 

20150731 Section 2 Accountability Mechanisms.docx

Section2_AccountabilityMechanisms_2807.docx

20150731 Section 2 Accountability Mechanisms.pdf

Section2_AccountabilityMechanisms_2807.pdf

(info) Circulated on 31 July

(info) Circulated on 28 July

Fulfillment of requirements

 

 

 

Fulfillment of Requirements_31July.docx

Fulfillment of Requirements_30-Jul.docx

Fulfillment of Requirements_21July.docx

Fulfillment of Requirements_31July.pdf

Fulfillment of Requirements_30-Jul.pdf

Fulfillment of Requirements_21July.pdf

(info) Circulated on 31 July

(info) Draft circulated for CCWG ACCT Meeting #43 (21 July)

Appendix A: Background
 AppendixA_Background_2907.docxAppendixA_Background_2907.pdf(info) This document will need a small update to describe the main changes between 1st and 2nd drafts.
Appendix B: Charter
 Appendix B_Charter_2207.docxAppendix B_Charter_2207.pdf(tick) Final. This document was updated on 22 July to include SSAC as new Chartering Organization.
Appendix D: Work Area 1 Outcome
 Appendix D_WA1 Outcome_2207.docxAppendix D_WA1 Outcome_2207.pdf(tick) Final. This document was not updated since the 1st Draft Proposal.
Appendix E
 Appendix E_WA2 Outcome_2207.docxAppendix E_WA2 Outcome_2207.pdf(tick) Final. This document was not updated since the 1st Draft Proposal.
Appendix F
 Appendix F_AoC_2207.docxAppendix F_AoC_2207.pdf(tick) Final. This document was not updated since the 1st Draft Proposal.
Appendix H

 

 

Appendix H_Minority Statements_FINAL.docx

Appendix H_2907.docx

Appendix H_Minority Statements_FINAL.pdf

Appendix H_2907.pdf

(tick) Final

(info)  Updated on 29 July. This is a new section based on the proposed Bylaws changes for the IRP process (Section 4.1).

 

Section 5C - Accountability requirements
 Section 5C Accountability Requirements_2907.docxSection 5C Accountability Requirements_2907.pdf 
Background
 Background_2407.docxBackground_2407.pdf(info) This document will need a small update to describe the main changes between 1st and 2nd drafts.
Section 10 - Implementation
 Section 10_Implementation_2807.docxSection 10_Implementation_2807.pdf(info) Circulated on 28 July
Section 9 on WS 2

 

 

 

 

 

Section 9_WS2_2807.docx

20150417_CCWG_Section9_WS2-clean.docx

20150417_CCWG_Section8_WS2-clean.docx

20150417_CCWG_Section8_WS2-redline.docx

20150416_CCWG_Section8_WS2.docx

Section 9_WS2_2807.pdf

20150417_CCWG_Section9_WS2-clean.pdf

20150417_CCWG_Section8_WS2-clean.pdf

20150417_CCWG_Section8_WS2-redline.pdf

20150416_CCWG_Section8_WS2.pdf

(info) Circulated on 28 July
CCWG Slides for Consensus
 CCWSGSlideDeckfor consensus on PC2.pptxN/A(info) Presented at CCWG ACCT #45 (28 July)
Project Plan

 

 

CCWG_ProjectPlan_21July.docx

N/A

CCWG_ProjectPlan_21July.pdf

CCWG_ProjectPlan.pdf

 
Paris Communique

 

 

CCWG-Paris Communiqué-Final.docx

CCWG-Paris Communiqué-draft.docx

CCWG-Paris Communiqué-Final.pdf

CCWG-Paris Communiqué-draft.pdf

(tick) Final version. Link on website is https://www.icann.org/news/announcement-3-2015-07-20-en.

(info) This is the draft text.

F2F Meeting - Day 2 documents

 

 

 

 

 

 

 

 

 

WP-1-Removal-of-Individual-Directors-v01.pptx

WP-1 Recall Entire Board Slides for Paris-2.pptx

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

WP3-Paris.pdf

GAC Package.pdf

J18 IRP Constitutional Court.pdf

Options for Board Replacement in the Event of Full Board Re....pdf

7-19 Mission Commitments and Core Values.pdf

CCWG_ProjectPlan.pdf

CCWG-Paris Communiqué-draft_LS-hj-mw.pdf

 

 

updated 18 July 2015

ARIN Memos

 

 

N/A

N/A

ARIN_ Empowered Designators_ Proposed Amendments for ICANN Articles and Bylaws.pdf

ARIN_ Memo on Empowered Designators in ICANN Bylaws Amendments.pdf

 
Draft jurisdiction requirements

 

 

 

CCWG and jurisdiction V5.docx

CCWG and jurisdiction V4.docx

CCWG and jurisdiction.docx

CCWG and jurisdiction V5.pdf

CCWG and jurisdiction V4.pdf

CCWG and jurisdiction.pdf

 
F2F Meeting – Day 1 documents

 

 

 

 

 

 

 

WP-1-questions-budget-stratplan-v4.pptx

WP-1-questions-comm-mechanism-nature-votes-v03.pptx

WP-1-questions-AOC-reviews-in-bylaws.pptx

STWP_Updates.pptx

WP3-Paris.pptx

CWG- and CCWG July.pptx

Paris-Intro-Deck.pptx

WP-1-questions-budget-stratplan-v4.pdf

N/A

N/A

N/A

N/A

N/A

Paris-Intro-Deck.pdf

 

 

 

 

 

 

GAC Input Trends
 CCWG-Draft compilation of major trends in the GAC comments to the Paris meeting.pptxCCWG-Draft compilation of major trends in the GAC comments to the Paris meeting.pdf 
Bylaws Drafting Process
 N/ABylaw drafting process.pdf 
Discussion Starter Documents

 

 

 

 

N/A

N/A

N/A

N/A

Staff accountability - discussion starter.pdf

SOAC Accountability - discussion starter.pdf

Board duties - discussion starter.pdf

Diversity - discussion starter.pdf

(info) Discussed on WP3 call on 6 July
Public Comment FROZEN Shell
 N/APublic Comment - Frozen Shell - 16 June V1.pdf 
Public Consultations Trends
 CCWG Public Consultations Trends.pptxCCWG Public Consultations Trends.pdf 
Taking Stock & Next Steps - Istanbul Update
 CCWG - Taking stock and next steps.pptxCCWG - Taking stock and next steps.pdf 
Proposal Structure of Public Comment Report
 Proposed Structure of Public Comment Report.docxProposed Structure of Public Comment Report.pdf 
Draft criteria for comparison of accountability mechanisms

 

 

 

 

 

Comparing Accountability Options_v.3_Mar 17, 2015.xlsx

Comparing Accountability Options_v.2_Mar 17, 2015.xlsx

Comparing Accountability Options V1 March 17 2015.xlsx

Comparing Accountability Options v.3 March 17 2015.pdf

Comparing Accountability Options_v.2_Mar 17, 2015.pdf

Comparing Accountability Options V1 March 17 2015.pdf

 
Accountability Mechanism Template
 Accountability Mechanism Template.docxAccountability Mechanism Template.pdf 
Timeline

 

 

 

 

 

 

 

 

 

 

 

 

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Timeline_Dec09.pptx

CWG-CCWG_timeline_20150619.pdf

CWG-CCWG_timeline_20150611.pdf

CWG-CCWG_timeline_20150529.pdf

CCWG_timeline_20150430.pdf

R-CCWG_timeline_v0.9.7.4.pdf

CWG-CCWG_timeline_20150430.pdf

CWG-CCWG_timeline_v0.9.7.pdf

CWG-CCWG_timeline_20150320.pdf

CWG-CCWG_timeline_20150303.pdf

CCWG_timeline_20150216.pdf

ICG-CWG-CCWG_timeline_20150129.pdf

Timeline_Dec09.pdf

 

 

 

 

 

 

 

 

 

 

(info) Circulated to CWG and ICG

(info) Presentation for CCWG ACCT Meeting #1 (9 December 2014)

Legal Advice

 

ccwg-legal-advice-note-ajp.pptx

ccwg-legal-advice-note-ajp.pdf

(info) Presented at CCWG ACCT Meeting #9 (27 January 2015)

Problem Statement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20150313 CCWG Accountability - problem definition - advisor feedback - clean.docx

20150313 CCWG Accountability - problem definition - advisor feedback - redline.docx

20150305 CCWG Accountability - problem definition - advisor feedback - clean.docx

20150305 CCWG Accountability - problem definition - advisor feedback - redline.docx

ProblemDefinition_Strawman_Jan23(clean).docx

ProblemDefinition_Strawman_Jan23(redline).docx

ProblemDefinition_Strawman_Jan19.docx

ProblemDefinition_Strawman_Jan16.docx

ProblemDefinition_Strawman_Jan14.docx

ProblemDefinition_Strawman_Jan12.docx

ProblemDefinition_Strawman_Jan06.docx

20150313 CCWG Accountability - problem definition - advisor feedback - clean.pdf

20150313 CCWG Accountability - problem definition - advisor feedback - redline.pdf

20150305 CCWG Accountability - problem definition - advisor feedback - clean.pdf

20150305 CCWG Accountability - problem definition - advisor feedback - redline.pdf

ProblemDefinition_Strawman_Jan23(clean).pdf

ProblemDefinition_Strawman_Jan23(redline).pdf

ProblemDefinition_Strawman_Jan19.pdf

ProblemDefinition_Strawman_Jan16.pdf

ProblemDefinition_Strawman_Jan14.pdf

ProblemDefinition_Strawman_Jan12.pdf

ProblemDefinition_Strawman_Jan06.pdf

(info) Includes most recent edits

 

(info) Includes input received from Advisors

 

 

 

(info)Submitted to Advisors for input on  

 

Engagement with Advisors

  

 

Engagement with Advisors_Jan16.pptx 

Engagement with Advisors_Dec23.pptx

Engagement with Advisors_Jan16.pdf

Engagement with Advisors_Dec23.pdf

 
Mind Map

 

 

N/A

N/A

Mindmap_WS1_Requirements_Jan22.pdf

WS1 requirements_Jan20.pdf

 
CWG-Stewardship Accountability Issues

 

 

Detail on CWG Requirements for the CCWG.docx

N/A

Detail on CWG Requirements for the CCWG.pdf

CWG-Stewardship_AccountabilityIssues-Jan18.pdf

Circulated by CWG Chairs - see here

Google Document to track evolution of drafts here.

Flowchart

 

 

N/A

N/A

Link with CCWG Accountability - updated 26 January 2015.pdf

Link with CCWG Accountability_Flowchart.pdf

(info) Used in Joint CWG-Stewardship & CCWG-Accountability Chairs' Statement (26 January)
High Level Statements
High Level Statement_Jan8.docxHigh Level Statement_Jan8.pdf

(tick) Finalized  

Steps & Milestones
 N/AStepsMilestones_Dec16.pdf (info) Chairs' presentation at CCWG ACCT Meeting #2 (16 December 2014)
Charter Presentation
 

CCWG-Accountability Combined Presentation - 8 December.pptx 

CCWG-Accountability Combined Presentation - 8 December.pdf(info) Presentation at CCWG ACCT Meeting #1 (9 December 2014)

 

Documents circulated by CCWG-Accountability members and participants are listed below: 

RelationCirculated ByDateDOC/PPTPDF
MindmapJordan Carter

 

 

 

Mindmap-WS2-Topics.pdf

Work Stream 2 Topics.pdf

Poll ResultsGreg Shatan Detailed results of 23 Feb Poll - Distribution Analysis.docxDetailed results of 23 Feb Poll - Distribution Analysis.pdf
Decision Making ThresholdsJordan Carter 2015-11-18-Decision-Making-Thresholds.docx2015-11-18-Decision-Making-Thresholds.pdf
DIDPPadmini Baruah 

https://docs.google.com/spreadsheets/d/1M1gWBpa7tlxGPMWyB6xJryddahyZzjVIarSz0RJswDM/edit?usp=sharing

 

https://docs.google.com/document/d/1x1vG23FdIAzo4ro80eEieaokBpAeNVtYXjds6mHt2DE/edit?usp=sharing

N/A 

 

N/A

Improving TransparencyRobin Gross 

https://docs.google.com/document/d/11sX-zY5uie9s7zNeGz2GIRXk7BBg2xrbN_pplpJnNvc/edit?pli=1#

N/A
Board/GNSO on Public InterestBruce Tonkin N/A2015-10-12-Steve-Crocker-to-Jonathan-Robinson.pdf
Thune/Schatz letter
Paul Rosenzweig N/AThune-Schatz letter to Steve Crocker 10-15-15.pdf
Fadi's contribution to accountability
Grace Abuhamad N/AFadi's Contribution to ICANN Accountability.pdf
Chronology of Accountability Discussions
Jordan Carter 2015-10-09-ICANN-accty-chrono.docx2015-10-09-ICANN-accty-chrono.pdf
Budget
Cherine Chalaby Cherine's Comments reBudget.docxCherine's Comments reBudget.pdf
Communications ideas
James Gannon 

N/A

N/A

CCWG One PagePDF.pdf

CCWGOnePage Worked ExamplePDF.pdf

Redline of Legal memo
Samantha Eisner REDLINE Memo Comparison of Board Proposal to CCWG 2nd Draft Proposal.docREDLINE Memo Comparison of Board Proposal to CCWG 2nd Draft Proposal.pdf
Alternative Compromise on Community Mechanism
Kavouss Arasteh Alternative-compromise Community Mechanism.docxAlternative-compromise Community Mechanism.pdf
Review of Board comments
Kavouss Arasteh 

Arasteh - Memo - Comparison of Board Proposal to CCWG 2nd Draft Proposal.docx

Input.docx

Summary of the Board,s input to CCWG.docx

Arasteh - Memo - Comparison of Board Proposal to CCWG 2nd Draft Proposal.pdf

Input.pdf

Summary of the Board,s input to CCWG.pdf

Board comments to CCWG
Greg Shatan Summary Comparison Chart of Board Comments Matrix and Notes.docxSummary Comparison Chart of Board Comments Matrix and Notes.pdf
 Greg Shatan

 

 

N/A

IANA Trademark and Domain Name Information.docx

assignment-tm-2283-0068.pdf

N/A

Communique dotAfrica
Seun Ojedeji N/ACommunique-dotAfrica.pdf
Draft comments on Executive Summary
Christopher Wilkinson N/ADRAFT COMMENTS ON EXSUMMARY.pdf
 Samantha Eisner Independence-of-Directors-Presentation[1].pptxN/A
Implementation and Impact Testing Questions
for CCWG
Bruce Tonkin N/AImplementation and Impact Testing Questions for CCWG.pdf
 Siva Muthusamy N/AMuthusamy_DraftonProcess_Jan20.pdf
F2F Discussions
Thomas Schneider Schneider_Food4Thought_Jan19.docx 
Vision Pitches
Paul Rosenzweig N/APitch_Rosenzweig_Jan19.pdf
Vision Pitches
Roelof Meijer N/A

Pitch_Meijer_Jan19.pdf

Pitch_Meijer_Text_Jan19.pdf

Vision Pitches
Jordan Carter N/APitch_Carter_19Jan.pdf
WA4 Scenarios
Malcolm Hutty Hutty_WA4 Scenarios_Jan18.docxHutty_WA4 Scenarios_Jan18.pdf
WA1 Draft
Tijani Ben Jemaa WA 1_draft_15Dec-Tijani.docxWA 1_draft_15Dec-Tijani.pdf
Problem Statement
Kavouss Arasteh Arasteh_ProblemDefinition_Jan1.docxArasteh_ProblemDefinition_Jan1.pdf
 Kavouss Arasteh Arasteh_CCWGComments_Dec17.docxArasteh_CCWGComments_Dec17.pdf

 

Documents circulated as part of sub-team work are available as listed below: 