Structure of Report

Draft Report Posted for Public Comment
.DOCX
.PDF

V. 11 (4 May 2015)

With Appendices: CCWG-Draft-Proposal-clean.docx

Without Appendices: CCWG-Draft-Proposal-clean-noAppendices.docx

Draft Proposal with Appendices: English | Pусский | العربية | Español | 中文  | Français | Português

Without Appendices: English

* This draft was updated on 5 May 2015 to fix a formatting error in the originally posted file.

XPLANE Graphics: English Pусский العربية Español 中文 | Français Português

Executive Summary: English | Pусский | العربية | Español | 中文 | Français | Português

Webinar Slides: English | Pусский | العربية | Español | 中文 | Français | Português

Other resources can be found here: Translated Resources

See details
Draft Report StructureDraft 

V.10 (1 May)

CCWG-Draft-Proposal-V10-clean.docx

Redline: CCWG-Draft-Proposal-V10-redline.docx

CCWG-Draft-Proposal-V10-clean.pdf

Redline: CCWG-Draft-Proposal-V10-redline.pdf

XPLANE: XPL_CCWG_IllustratedConcepts_v1.1.pdf 

NEW FROZEN COMPILATION (28 APRIL)

CCWG-DRAFT-V4.2-042815.docx

Redline: CCWG Draft Redline from 1-1 to 2015-04-28 version.docx

CCWG-ComPowers-DRAFT-042315.pdf

Redline: CCWG Draft Redline from 1-1 to 2015-04-28 version.pdf

FROZEN COMPILATION

CCWG-Report Draft v1.2.docx

  • V1.2 includes formatting and table of content related edits

CCWG-Report Draft v1.1.docx

CCWG-Report Draft v1.2.pdf

  • V1.2 includes formatting and table of content related edits

CCWG-Report Draft v1.1.pdf

0. Summary

PLACEHOLDERPLACEHOLDER
  1. Introduction & Background
  2. Methodology
  3. Definitions & Scoping
  4. Inventory of existing ICANN Accountability Mechanisms
  5. Input gathered from Community - Required Community Powers

FROZEN

Sections 1, 2, 3, 4, 5.docx

 

FROZEN

Sections 1, 2, 3, 4, 5.pdf

6. Accountability Mechanisms

6.1 Description of overall accountability architecture

PLACEHOLDERPLACEHOLDER

6.2 Revised mission, commitments & core values

6.3 Fundamental Bylaws

6.4 Independent Review Panel Enhancements

6.7 Reconsideration Process Enhancements

FROZEN

4-17 ICANN Mission - Frozen Draft.docx

4-23 Annotated Commitments and Core Values Language Frozen Draft Reconciled with pp 44 -47 of Frozen Draft[1].docx

4-17 Annotated Commitments and Core Values Language Frozen Draft.docx

2015-04-23 fundamental bylaws.docx

 17 April 2015 IRP Frozen draft.docx

Request for reconsideration_v4.1.docx


FROZEN

4-17 ICANN Mission - Frozen Draft.pdf

4-23 Annotated Commitments and Core Values Language Frozen Draft Reconciled with pp 44 -47 of Frozen Draft[2].pdf

4-17 Annotated Commitments and Core Values Language Frozen Draft[1].pdf

2015-04-23 fundamental bylaws.pdf

17 April 2015 IRP Frozen draft.pdf

Request for reconsideration_v4.1.pdf


6.6 Community Empowerment

6.6.1 Mechanism to empower the community: name of mechanism

6.6.2 Power: reconsider/reject budget or strategy / operating plans                           

6.6.3 Power: reconsider/reject changes to ICANN Bylaws                                             

6.6.4 Power: Approve Changes to “Fundamental” Bylaws                                 

6.6.5 Power: Recalling individual ICANN Directors

6.6.6 Power: Recalling the entire ICANN Board

6.7 Incorporating AoC into the ICANN Bylaws

6.7.1 Preserving ICANN Commitments from the AoC

6.7.2 AoC Reviews

6.8 Incorporating AoC into the ICANN Bylaws

6.8.1 Forcing the Board to respond to Advisory Committee formal advice

6.8.2 Require consultation and mutually acceptable GAC advice that is backed by consensus

FROZEN

2015-04-17-WP1-firstcommentreport-content.docx

6.6.1 Update (session 1)

CLEAN 6-6-1 MECHANISM JTC CONTENT ADD-1.docx

6-6-1 MECHANISM JTC CONTENT ADD-1.docx

FROZEN

 2015-04-17-WP1-firstcommentreport-content.pdf

6.6.1 Update

CLEAN 6-6-1 MECHANISM JTC CONTENT ADD-1.pdf

6-6-1 MECHANISM JTC CONTENT ADD-1.pdf

7. Stress Tests

FROZEN

Applying Stress Tests Draft v10.1.docx

FROZEN

Applying Stress Tests Draft v10.1.docx

8. Items for consideration in Work Stream 2

FROZEN

20150417_CCWG_Section8_WS2-clean.docx

FROZEN

20150417_CCWG_Section8_WS2-clean.pdf 

9. Implementation Plan including timing

PLACEHOLDER

Implementation Plan including timing.doc

PLACEHOLDER

Implementation Plan including timing.pdf

10. Set of questions for public commentPLACEHOLDERPLACEHOLDER
Request for Reconsideration - WP2
DateDOCPDF
 

Request for reconsideration_v4.1.docx

Request for reconsideration_v4.1.pdf

  • No labels