Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The APRALO Rules of Procedure Working Group (APRALO ROPs Review WG) was first initiated in 2019 but was subsequently suspendedhalted, pending the work and eventual ratification by the ALAC of the recommendations in 2 reports: (a) the ALS (At-Large Structure) Mobilization Working Party Report on 4 Dec 2020 (WP wiki space); and (b) the Unaffiliated Individual Members (UIM) Mobilization Working Party Report on 25 Mar 2021 (WP wiki space). 

The APRALO ROPs Review WG was then reconstituted in Nov early Oct 2023 (WG wiki space) and led by Co-Chairs Cheryl Langdon-Orr and Justine Chew, the working group completed its substantial review and redrafting of the APRALO ROP in Jan 2024, in light of key considerations considering residual work that had been identified, including: (1) Unaffiliated Individual Member criteria, (2) Role of UIM Representative, (3) The Selection Process, (4) Membership type, (5) Membership status, and (6) Code of Conduct.

...

  1. The APRALO had adopted its current APRALO Rules of Procedure (ROP) on 26 March 2014.
  2. The At-Large Advisory Committee (ALAC) had ratified the ALS (At-Large Structure) Mobilization Working Party Report on 4 December 2020 and the  Unaffiliated Individual Members (UIM) Mobilization Working Party Report on 25 March 2021. 
  3. In light of the ALAC's ratification of the 2 mentioned Working Party Reports, the APRALO concluded that a review of its Rules of Procedure of March 2014 was necessary, and reconstituted the APRALO Rules of Procedure Working Group (APRALO ROPs Review WG) for this task in early October 2023.
  4. The APRALO ROP was discussed at the APRALO General Assembly 2023 held in Istanbul, Türkiye on 12-13 September 2023. 
  5. TheAPRALO ROPs Review WG completed its substantial review and redrafting of the existing APRALO ROP in January 2024, and with the draft ROP of 31 January 2024 having undergone vetting by ICANN Legal, the APRALO ROPs Review WG Co-Chairs Cheryl Langdon-Orr and Justine Chew then completed a final check and generated the Final Draft APRALO ROP 2024 as at 3 May 2024for adoption by APRALO.

...