Page History
...
Draft Report Structure | Draft | |
---|---|---|
FROZEN COMPILATION | CCWG-Report Draft v1.1.docx | CCWG-Report Draft v1.1.pdf |
0. Summary | PLACEHOLDER | PLACEHOLDER |
| ||
6. Accountability Mechanisms 6.1 Description of overall accountability architecture | PLACEHOLDER | PLACEHOLDER |
6.2 Revised mission, commitments & core values 6.3 Fundamental Bylaws 6.4 Independent Review Panel Enhancements 6.7 Reconsideration Process Enhancements | 4-17 ICANN Mission - Frozen Draft.docx 4-17 Annotated Commitments and Core Values Language Frozen Draft.docx | FROZEN 4-17 ICANN Mission - Frozen Draft.pdf 4-17 Annotated Commitments and Core Values Language Frozen Draft[1].pdf |
6.5 6 Community Empowerment 6.56.1 Mechanism to represent empower the community (community council or other): name of mechanism 6.56.2 Reject Budget/Strategy Power: reconsider/reject budget or strategy / operating plans 6.5.3 Reject Bylaw change6.3 Power: reconsider/reject changes to ICANN Bylaws 6.56.4 Approve Fundamental Bylaw change Power: Approve Changes to “Fundamental” Bylaws 6.56.5 Recall of Board Power: Recalling individual ICANN Directors 6.56.6 Individual Board member recall Power: Recalling the entire ICANN Board 6.7 Incorporating AoC into the ICANN Bylaws 6.7.1 Preserving ICANN Commitments from the AoC5.7 Others if needed 6.7.2 AoC Reviews 6.8 Incorporating AoC reviews transcriptioninto the ICANN Bylaws 6.8.1 Forcing the Board to respond to Advisory Committee formal advice 6.7.9 Bylaw changes recommended after stress tests8.2 Require consultation and mutually acceptable GAC advice that is backed by consensus | 2015-04-17-WP1-firstcommentreport-content.docx
| 2015-04-17-WP1-firstcommentreport-content.pdf
|
7. Stress Tests | FROZEN | FROZEN |
8. Items for consideration in Work Stream 2 | FROZEN | FROZEN |
9. Implementation Plan including timing | PLACEHOLDER | PLACEHOLDER |
10. Set of questions for public comment | PLACEHOLDER | PLACEHOLDER |
...