Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Draft Report StructureDraft 
FROZEN COMPILATION
CCWG-Report Draft v1.1.docxCCWG-Report Draft v1.1.pdf

0. Summary

PLACEHOLDERPLACEHOLDER
  1. Introduction & Background
  2. Methodology
  3. Definitions & Scoping
  4. Inventory of existing ICANN Accountability Mechanisms
  5. Input gathered from Community - Required Community Powers

FROZEN

Sections 1, 2, 3, 4, 5.docx

 

FROZEN 

Sections 1, 2, 3, 4, 5.pdf

6. Accountability Mechanisms

6.1 Description of overall accountability architecture

PLACEHOLDERPLACEHOLDER

6.2 Revised mission, commitments & core values

6.3 Fundamental Bylaws

6.4 Independent Review Panel Enhancements

6.7 Reconsideration Process Enhancements

FROZEN

 4-17 ICANN Mission - Frozen Draft.docx

4-17 Annotated Commitments and Core Values Language Frozen Draft.docx

 17 April 2015 IRP Frozen draft.docx

Request for reconsideration_v4.1.docx

FROZEN

4-17 ICANN Mission - Frozen Draft.pdf

4-17 Annotated Commitments and Core Values Language Frozen Draft[1].pdf

17 April 2015 IRP Frozen draft.pdf

Request for reconsideration_v4.1.pdf

6.5 6 Community Empowerment

6.56.1 Mechanism to represent empower the community (community council or other): name of mechanism

6.56.2 Reject Budget/Strategy Power: reconsider/reject budget or strategy / operating plans                           

6.5.3 Reject Bylaw change6.3 Power: reconsider/reject changes to ICANN Bylaws                                             

6.56.4 Approve Fundamental Bylaw change Power: Approve Changes to “Fundamental” Bylaws                                 

6.56.5 Recall of Board Power: Recalling individual ICANN Directors

6.56.6 Individual Board member recall Power: Recalling the entire ICANN Board

6.7 Incorporating AoC into the ICANN Bylaws

6.7.1 Preserving ICANN Commitments from the AoC5.7 Others if needed

6.7.2 AoC Reviews

6.8 Incorporating AoC

reviews transcription

into the ICANN Bylaws

6.8.1 Forcing the Board to respond to Advisory Committee formal advice

6.7.9 Bylaw changes recommended after stress tests8.2 Require consultation and mutually acceptable GAC advice that is backed by consensus

FROZEN

2015-04-17-WP1-firstcommentreport-content.docx

 

FROZEN

 2015-04-17-WP1-firstcommentreport-content.pdf

 


7. Stress Tests

FROZEN

Applying Stress Tests Draft v10.1.docx

FROZEN

Applying Stress Tests Draft v10.1.docx

8. Items for consideration in Work Stream 2

FROZEN

20150417_CCWG_Section8_WS2-clean.docx

FROZEN

20150417_CCWG_Section8_WS2-clean.pdf 

9. Implementation Plan including timing

PLACEHOLDER

Implementation Plan including timing.doc

PLACEHOLDER

Implementation Plan including timing.pdf

10. Set of questions for public commentPLACEHOLDERPLACEHOLDER

...