Please use the following blank template          Template - Revised 17 Aug 2013

Wiki version of template

Issue Assignments

IssueReview Team Member

GAC participation in policy processes (WS1.b)

Lawrence Strickling

Publication of yearly statistical reports on transparency (whistle blower) (WS4)

Avri Doria

Cross-constituency work

Alan Greenberg, Avri Doria

Reconsideration (WS1.a)

Carlos Gutierrez

Public comment process (WS1.c)

Brian Cute

PDP (WS1.e)

Alan Greenberg

Communications for the Board (WS1.a)

David Conrad

Communications for the GAC (WS1.b)

Stephen Conroy

Review process (WS4)

Brian Cute, David Conrad

Multilingual Quality (WS4)

Lise Fuhr, Fiona Asonga

Draft templates submitted For DC meeting

Working draft of report

Draft templates submitted and updated

b c) c) c senior staffing arrangements are appropriately multilingual 
No.SourcePrior RT Recommend. ReferenceStreamTopicToken holderTemplateStaff ResponsesATRT2 Member CommentsNotes
1ATRT11 a-d

WS 1 (9.1 a)

Mechanisms for identifying collective Board skillset;
benchmarking Board/BGC skillsets; tailoring & consulting on skills;
reviewing for each NomCom; publishing outcomes & requirements with NomCom’s notice.                           
Avri

Combined Template for issues 1&2  

[atrt2] Staff clarification and response to ATRT 2 questions - Inventory Items 1-4 - Board Operations.pdf;

RE_ [atrt2] Research reference to recommendations not being implemented_WS1.pdf

 1, 2 being combined into a single document with great assistance
2ATRT12
No.SourcePrior RT Recommend. ReferenceStreamTopicToken holderTemplateStaff ResponsesATRT2 Member CommentsNotes
1ATRT11 a-dWS 1 (9.1 a)Mechanisms for identifying collective Board skillset;
benchmarking Board/BGC skillsets; tailoring & consulting on skills;
reviewing for each NomCom; publishing outcomes & requirements with NomCom’s notice.                           
Avri / Briandraft  under developmentRegularly reinforce/review training & skills building.Avri

Combined Template for issues 1&2  

[atrt2] Staff clarification and response to ATRT 2 questions - Inventory Items 1-4 - Board Operations.pdf 1, 2 being combined into a single with great assistance2ATRT12WS 1 (9.1 a)Regularly reinforce/review training & skills building.Avri / Brian    
3ATRT13WS 1 (9.1 a)Increase transparency of NomCom’s deliberations & decision-making process.
ASAP but starting no later than next NomCom.
Avri / Brian    
4ATRT14WS 1 (9.1 a)Continue to enhance Board performance & work practices.Brian / AvriTemplate ATRT1 - Rec 4   

Template 3 (3Oct) (submitted 3 Oct) - Latest

[atrt2] Staff clarification and response to ATRT 2 questions - Inventory Items 1-4 - Board Operations.pdf 

To be folded into multilingual group recommendation/document

4ATRT145ATRT15WS 1 (9.1 a)Implement compensation scheme for voting Board DirectorsContinue to enhance Board performance & work practices.Brian / Avri

Template ATRT1 - Rec 4

Latest: Template ATRT1 - Rec

5

4 (3 Oct).docx (submitted 3 Oct)

   
65ATRT165WS 1 (9.1 a)Clarify distinction between PDP & executive function issuesImplement compensation scheme for voting Board Directors.Brian / AvriTemplate - ATRT1 - Rec 6. 5, updated 29 Sept.docx[atrt2] Staff clarification and response to ATRT 2 questions - Inventory Items 1-4 - Board Operations.pdf   
76ATRT17.16WS 1 (9.1 a)Promptly publish all appropriate Board materials related to decision-making processes.Clarify distinction between PDP & executive function issues.Avri / BrianTemplate ATRT1 - Rec 7.16, updated 29 September.docxStaff clarification - Inventory Item #6 - Distinction between PDP & executive function.pdf   
87ATRT17.21WS 1 (9.1 a)Publish rationale for Board decisions and for accepting or rejecting public & community input.Promptly publish all appropriate Board materials related to decision-making processes.Avri / BrianTemplate ATRT1 - Rec 7.21, updated 29 September.docx   
98ATRT187.2WS 1 (9.1 a)Publish redaction conditionsrationale for Board decisions and for accepting or rejecting public & community input.Brian / Avri 
Template ATRT1 - Rec 7.2   
109ATRT1198WS 1 (9.1 a)Publish translated Board material within 21 daysredaction conditions.Brian / Avri    
1110ATRT2ATRT119WS 4Multilingual quality and timeliness 1 (9.1 a)Publish translated Board material within 21 daysLiseRecommendation 18 19 and 22 September 28.docx on 29 Sept    
1211ATRT1ATRT22019WS 1 (9.1 a)Ensure/certify that inputs in policymaking processes are considered by the BoardAvri / Brian 4Multilingual quality and timelinessLise

Recommendation 18 19 and 22 September 28.docx on 29 Sept

 

ICANN Language Services Department Plan_2013-2014.pdf   
1312ATRT12320WS 1 (9.1 a)Get input from committee of independent experts on restructuring review mechanisms      
14ATRT125WS 1 (9.1 a)Clarify standard for Reconsideration requests     
Ensure/certify that inputs in policymaking processes are considered by the BoardAvri / Carlos

draft

Combined draft under construction

Draft-130929

Draft-131003

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

ATRT 1 Recommendation #20 - information shared by Sam Eisner previously 12-16 & 35, 36 to be combined into single document.
13ATRT12315ATRT124WS 1 (9.1 a)Assess Ombudsman relationship and confirm framework is consistent with international standardsGet input from committee of independent experts on restructuring review mechanisms Carlos / Avri

Combined draft under construction  

Staff Clarification and request for additional information - Inventory Item #15 and #35  
16ATRT126WS 1 (9.1 a)Adopt standard timeline & format for Reconsideration RequestsBrian / Avri    

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

Development of the Accountability Structures Expert Panel (ASEP) and Delivery of Work - Response to Registry Submission.pdf 12-16 & 35, 36 to be combined into single document.
14ATRT12517ATRT19WS 1 (9.1 ba)Clarify what constitutes GAC public policy “advice” under  the Bylaws.     
18ATRT110WS 1 (9.1 b)Create formal, documented process for requesting, tracking GAC advice.     
standard for Reconsideration requestsCarlos / Avri

Combined draft under construction  

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

Development of the Accountability / Structures Expert Panel (ASEP) and Delivery of Work - Response to Registry Submission.pdf 12-16 & 35, 36 to be combined into single document.
15ATRT12419ATRT111WS 1 (9.1 ba)Ensure timely provision & consideration of GAC advice and mechanisms for Board follow-up     
20ATRT112; 13WS 1 (9.1 b)

Board, acting through the JWG, should develop & implement a process to engage the GAC earlier in the policy development process; ensure GAC is fully informed of policy agenda & policy staff is aware of GAC concerns.

     
Assess Ombudsman relationship and confirm framework is consistent with international standardsAvri / Carlos

Combined draft under construction  

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

Staff Clarification and request for additional information - Inventory Item #15 and #35 12-16 & 35, 36 to be combined into single document.
16ATRT12621ATRT114WS 1 (9.1 a)Increase support & commitment of governments to the GAC process     
22ATRT115WS 1 (9.1 c)Implement stratified, prioritized public Notice & Comment processes.     
Adopt standard timeline & format for Reconsideration RequestsAvri / Carlos

Combined draft under construction  

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

  12-16 & 35, 36 to be combined into single document.
17ATRT1923ATRT116; 17WS 1 (9.1 Provide “Comment” cycle & a “Reply Comment” comment cycles; review and adjust fixed timelines for Notice & Comment Template ATRT1 - Rec 16   b)Clarify what constitutes GAC public policy “advice” under  the Bylaws.Larry

ATRT2 GAC Recommendations Sept 29.docx

Latest: ATRT2 GAC Recommendations Oct 2.docx (submitted 2 October)

ATRT2 GAC Recommendations Aug 30 - Staff Comments updated 26 Sept.pdf

GAC Related Recommendations - Jorgen Abild Anderson Response and Comments.pdf on 29 September

ATRT2 New Draft of Report on ATRT1 Recommendations 9-14 - CG

 
18ATRT11024ATRT118WS 1 (9.1 Ensure multilingual access in PDP to maximum extent feasible     
25ATRT121WS 1 (9.1 c)Create annual public  comment forecast     
b)Create formal, documented process for requesting, tracking GAC advice.Larry

ATRT2 GAC Recommendations Sept 29.docx

Latest: ATRT2 GAC Recommendations Oct 2.docx (submitted 2 October)

ATRT2 GAC Recommendations Aug 30 - Staff Comments updated 26 Sept.pdf

GAC Related Recommendations - Jorgen Abild Anderson Response and Comments.pdf on 29 September

ATRT2 New Draft of Report on ATRT1 Recommendations 9-14 - CG

 
19ATRT11126ATRT122WS 1 (9.1 b)Ensure      
27ATRT127WS 1 (9.1 d)Evaluate and report on progress on recommendations and accountability & transparency commitments in the AoC.Brian / Avri    
timely provision & consideration of GAC advice and mechanisms for Board follow-upLarry

ATRT2 GAC Recommendations Sept 29.docx

Latest: ATRT2 GAC Recommendations Oct 2.docx (submitted 2 October)

ATRT2 GAC Recommendations Aug 30 - Staff Comments updated 26 Sept.pdf

GAC Related Recommendations - Jorgen Abild Anderson Response and Comments.pdf on 29 September

ATRT2 New Draft of Report on ATRT1 Recommendations 9-14 - CG

 
20ATRT112; 1328ATRT2 WS 1 (9.1 e)Effectiveness of the GNSO PDPAlan / Avri    
29ATRT2 WS 1 (9.1 e)Effectiveness of cross-community deliberationsAvri / Alandraftv2   
30ATRT2 WS 4Make improvements to the Review processes: 
Appointment of Review Teams
     
31ATRT2 WS 4Make improvements to the Review processes: 
Getting the Review Team started  with a complete implementation report 
     
b)

Board, acting through the JWG, should develop & implement a process to engage the GAC earlier in the policy development process; ensure GAC is fully informed of policy agenda & policy staff is aware of GAC concerns.

Larry

ATRT2 GAC Recommendations Sept 29.docx

Latest: ATRT2 GAC Recommendations Oct 2.docx (submitted 2 October)

ATRT2 GAC Recommendations Aug 30 - Staff Comments updated 26 Sept.pdf

GAC Related Recommendations - Jorgen Abild Anderson Response and Comments.pdf on 29 SeptemberRe_ atrt2 New Draft of Report on ATRT1 Recommendations 9-14 - CG.pdf


ATRT2 New Draft of Report on ATRT1 Recommendations 9-14 - CG

 
21ATRT114WS 1 (9.1 b)Increase support & commitment of governments to the GAC processLarry

ATRT2 GAC Recommendations Sept 29.docx

Latest: ATRT2 GAC Recommendations Oct 2.docx (submitted 2 October)

ATRT2 GAC Recommendations Aug 30 - Staff Comments updated 26 Sept.pdf

GAC Related Recommendations - Jorgen Abild Anderson Response and Comments.pdf on 29 September

ATRT2 New Draft of Report on ATRT1 Recommendations 9-14 - CG

 
22ATRT115WS 1 (9.1 c)Implement stratified, prioritized public Notice & Comment processes.Brian32ATRT2 WS 4Make improvements to the Review processes: 
Review Budget Transparency and Accountability
     
2333ATRT2 WS 4Make improvements to the Review processes: 
Incorporation of review teams input into ICANN strategic plan and Institutionalization of progress
  ATRT116; 17WS 1 (9.1 c)Provide “Comment” cycle & a “Reply Comment” comment cycles; review and adjust fixed timelines for Notice & CommentBrianTemplate ATRT1 - Rec 16Staff Response - Inventory Item #23 - Comment and Reply Comment.pdf   
3424ATRT2ATRT1 18WS 4Review actions of the Board and staff in ensuring public interest: 
Finance Accountability and Transparency
 Template - ATRT2 #341 (9.1 c)Ensure multilingual access in PDP to maximum extent feasibleLiseRecommendation 18 19 and 22 September 28.docx on 29 Sept    
2535ATRT1ATRT221WS 4Review actions of the Board and staff in ensuring public interest: 
Publication of yearly statistical reports on transparency
AvriAnnual Transparency Auditdraftv3Staff Clarification and request for additional information - Inventory Item #15 and #35  needs revision based on Staff comments
36ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Employee Hotline (Whistleblower Policy)
Avri    
37ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Volunteer engagement
     
38ATRT2 WS 2Board handling of SSR RT recommendations     
39ATRT2SSR Recs 1-28WS 2Assessment of implementation of SSR RT recommendations     
40ATRT2 WS 3Board handling of WHOIS RT recommendations     
41ATRT2WHOIS Recs 1-16WS 3Assessment of implementation of WHOIS RT recommendations ATRT2-Whois_Implementation-Status-2013-09-15-final   
42ATRT2 WS 4Outreach    Included in GAC-related  recommendations

Draft templates submitted For LA meeting

1 (9.1 c)Create annual public  comment forecastLiseRec 21.docx   
26ATRT122WS 1 (9.1 c)Ensure senior staffing arrangements are appropriately multilingualLise

Recommendation 18 19 and 22 September 28.docx on 29 Sept

 

Staff response and clarification - Inventory Item #26-Ensure senior staffing arrangements are appropriately multilingual.pdf  
27ATRT127WS 1 (9.1 d)Evaluate and report on progress on recommendations and accountability & transparency commitments in the AoC.Brian / Avri    
28ATRT2 WS 1 (9.1 e)Effectiveness of the GNSO PDPAlan / Avri

PDP-template-v02.docx

Template 28&29 Combined

PDP-template-2013-10-03.docx

Latest: Template 28-29-AG-Oct4.docx (submitted 4 October)

  

Recommendations 28 & 29 have been combined into a common report.

Early Draft of Independent Study

29ATRT2 WS 1 (9.1 e)Effectiveness of cross-community deliberationsAvri / Alan

draftv2

Template 28&29 Combined

PDP-template-2013-10-03.docx

Latest: Template 28-29-AG-Oct4.docx (submitted 4 October)

Recommendation 19 and 22 - Language Services.docxBlog Post - Cross Community Working Groups 

Recommendations 28 & 29 have been combined into a common report.

Early Draft of Independent Study

30ATRT2 WS 4Make improvements to the Review processes: 
Appointment of Review Teams
Fiona

WS 4-Agreed Potential Recommendations 17 August.doc

Templates 30-33 (1 Oct)

Latest:  Review process template Rec 30,31,32,33 v2.doc (submitted  7 October)

 

Staff Clarification and request for additional info - Inventory Item #30, #31, #33Clarification on Inventory Items 30_31_ 33 
31ATRT2 WS 4Make improvements to the Review processes: 
Getting the Review Team started  with a complete implementation report 
Fiona

WS 4-Agreed Potential Recommendations 17 August.doc

Templates 30-33 (1 Oct)

Latest:  Review process template Rec 30,31,32,33 v2.doc (submitted  7 October)

Staff Clarification and request for additional info - Inventory Item #30, #31, #33Clarification on Inventory Items 30_31_ 33  
32ATRT2 WS 4Make improvements to the Review processes: 
Review Budget Transparency and Accountability
Fiona

WS 4-Agreed Potential Recommendations 17 August.doc

Templates 30-33 (1 Oct)

Latest:  Review process template Rec 30,31,32,33 v2.doc (submitted  7 October)

   
33ATRT2 WS 4Make improvements to the Review processes: 
Incorporation of review teams input into ICANN strategic plan and Institutionalization of progress
Fiona

WS 4-Agreed Potential Recommendations 17 August.doc

Templates 30-33 (1 Oct)

Latest:  Review process template Rec 30,31,32,33 v2.doc (submitted  7 October)

Staff Clarification and request for additional info - Inventory Item #30, #31, #33Clarification on Inventory Items 30_31_ 33  
34ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Finance Accountability and Transparency
Lise

Template - ATRT2 #34

Latest: Finances 2 October.doc (submitted 2 October)

Staff response (partial) - Inventory Item #34 - Finance Accountability and Transparency.pdf

 

Call with Jorgen, Xavier and Larisa - audio

Carlos' response on 28 Sept Finance template - Carlos Gutierrez response.pdf

Re_ [atrt2] Finances template -CG.pdf

ATRT2 - Response to #34

ICANN Management Org Chart 

 
35ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Publication of yearly statistical reports on transparency
Avri / Carlos

Annual Transparency Auditdraftv3

updated draft

Combined draft under construction  

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

Staff Clarification and request for additional information - Inventory Item #15 and #35  12-16 & 35, 36 to be combined into single document.
36ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Employee Hotline (Whistleblower Policy)
Avri / Carlos

draft

Combined draft under construction  

Draft-130929  

Draft-131003  

Latest: Template 12-16, 35-36_PD&BCclean.docx (submitted 3 Oct)

  12-16 & 35, 36 to be combined into single document.
37ATRT2 WS 4Review actions of the Board and staff in ensuring public interest: 
Volunteer engagement
Carlos, Avri, Alan [atrt2] Staff clarification - Inventory Item #37 - Volunteer engagement.pdf 

Some of this may be included in the 12-16, 35, 36 merger. But not specifically done.

38ATRT2 WS 2Board handling of SSR RT recommendations   
39ATRT2SSR Recs 1-28WS 2Assessment of implementation of SSR RT recommendationsDavid

SSR templates v0 2.docx (submitted 6 October)

   
40ATRT2 WS 3Board handling of WHOIS RT recommendationsAlan, Michael    
41ATRT2WHOIS Recs 1-16WS 3Assessment of implementation of WHOIS RT recommendationsAlan, Michael

ATRT2-Whois_Implementation-Status-2013-09-29-v01.pdf

Revised version: ATRT2-Whois_Implementation-Status-2013-10-02.docx

ATRT2-Whois_Implementation-Status-2013-10-08-v03.docx 

Latest: ATRT2-Whois_Implementation-Status-2013-10-08-v04.1.docx

(submitted on 8 October, revised)

ATRT2 Chart Alt Implementation of WHOIS RT recs v2

ATRT2 Implementation of WHOIS RT recs - Final

Compliance Staffing (WHOIS Policy RT Report Appendix B)

Current Compliance Staffing (19 Sept 2013)

 
42ATRT2 WS 4OutreachJørgen   Included in GAC-related  recommendations

Draft templates submitted For LA meeting

Mapping to Work-StreamTopicLinkAuthorDateNotes/comments
WS1 a.ReconsiderationTemplate Draft - Reconsideration (Carlos Raul Gutierrez)Carlos Raul Gutierrez9 August 2013 
WS1 a.Communications with/for the Board

Template Draft - Communications with/for the Board (David Conrad)

ICANN Board Resolutions Review.docx

David Conrad

10 August 2013

 

26 August 2013

 

 

ATRT 1 Rec #7.2

WS 1 b.GAC InteractionTemplate Draft - GAC interactions (Xinsheng Zhang)Xinsheng Zhang13 August 2013 
WS 1 b.Assessment of ATRT1 GAC-related recommendations

Updated: ATRT2 GAC Recommendations Aug 30.docx

Original: Template Draft - Assessment GAC recs (Larry Stricking)

Larry Strickling9 August 2013 
WS 1 b.ATRT2 proposed new GAC related recommendations

Updated: see above (combined ATRT 1 Rec Assessment and New Recs)

Original: Template Draft - Proposed New GAC-related Recommendations (Larry Strickling)

Larry Strickling9 August 2013 
WS 1 c.Public CommentTemplate Draft - Public Comment (Brian Cute)Brian Cute15 July 2013 
 WS 1 e.Cross-Community ReviewTemplate draft - Cross-Community Review (Avri Doria)Avri Doria15 July 2013Merged with Greenberg draft
WS 1 e.Cross-ConstituencyTemplate Draft - Cross-Constituency (Alan Greenberg)Alan Greenberg12 August 2013

Notes on PDP Process & Cross-Constituency (Alan Greenberg)

WS1 e.PDP ProcessTemplate Draft - PDP Process (Alan Greenberg)Alan Greenberg12 August 2013 
WS4Review ProcessTemplate draft - Review Process (Brian Cute)Brian Cute8 August 2013 
WS4Multilingual Quality

Template draft - Multilingual Quality (Fiona Asonga)

Template Draft v2 - Multilingual Quality (Fiona Asonga)

Fiona Asonga

17 July 2013

Update: 14 August 2013

 
WS4Annual Transparency Review

Template draft - Annual Transparency Review (Avri Doria)

Template Draft v2 - Annual Transparency Review (Avri Doria)

Template Draft v3 - Annual Transparency Review

Avri Doria

15 July 2013

Update: 10 August 2013

Update 130810

 

 


reformatted, moved to wiki

/Legitimacy/OutreachTemplate Draft - Legitimacy/outreach (Jorgen Abild Andersen)Jorgen Abild Andersen12 August 2013 
/FinancesTemplate Draft - Finances (Lise Fuhr)Lise Fuhr12 August 2013 

Issue Assignments

 

 

reformatted, moved to wiki
IssueReview Team Member

GAC participation in policy processes (WS1.b)

Lawrence Strickling

Publication of yearly statistical reports on transparency (whistle blower) (WS4)

Avri Doria

Cross-constituency work

Alan Greenberg, Avri Doria

Reconsideration (WS1.a)

Carlos Gutierrez

Public comment process (WS1.c)

Brian Cute

PDP (WS1.e)

Alan Greenberg

Communications for the Board (WS1.a)

David Conrad

Communications for the GAC (WS1.b)

Stephen Conroy

Review process (WS4)

Brian Cute, David Conrad

Multilingual Quality (WS4)

Lise Fuhr, Fiona Asonga
Mapping to Work-StreamTopicLinkAuthorDateNotes/comments
WS1 a.ReconsiderationTemplate Draft - Reconsideration (Carlos Raul Gutierrez)Carlos Raul Gutierrez9 August 2013 
WS1 a.Communications with/for the Board

Template Draft - Communications with/for the Board (David Conrad)

ICANN Board Resolutions Review.docx

David Conrad

10 August 2013

 

26 August 2013

 

 

ATRT 1 Rec #7.2

WS 1 b.GAC InteractionTemplate Draft - GAC interactions (Xinsheng Zhang)Xinsheng Zhang13 August 2013 
WS 1 b.Assessment of ATRT1 GAC-related recommendations

Updated: ATRT2 GAC Recommendations Aug 30.docx

Original: Template Draft - Assessment GAC recs (Larry Stricking)

Larry Strickling9 August 2013 
WS 1 b.ATRT2 proposed new GAC related recommendations

Updated: see above (combined ATRT 1 Rec Assessment and New Recs)

Original: Template Draft - Proposed New GAC-related Recommendations (Larry Strickling)

Larry Strickling9 August 2013 
WS 1 c.Public CommentTemplate Draft - Public Comment (Brian Cute)Brian Cute15 July 2013 
 WS 1 e.Cross-Community ReviewTemplate draft - Cross-Community Review (Avri Doria)Avri Doria15 July 2013Merged with Greenberg draft
WS 1 e.Cross-ConstituencyTemplate Draft - Cross-Constituency (Alan Greenberg)Alan Greenberg12 August 2013

Notes on PDP Process & Cross-Constituency (Alan Greenberg)

WS1 e.PDP ProcessTemplate Draft - PDP Process (Alan Greenberg)Alan Greenberg12 August 2013 
WS4Review ProcessTemplate draft - Review Process (Brian Cute)Brian Cute8 August 2013 
WS4Multilingual Quality

Template draft - Multilingual Quality (Fiona Asonga)

Template Draft v2 - Multilingual Quality (Fiona Asonga)

Fiona Asonga

17 July 2013

Update: 14 August 2013

 
WS4Annual Transparency Review

Template draft - Annual Transparency Review (Avri Doria)

Template Draft v2 - Annual Transparency Review (Avri Doria)

Template Draft v3 - Annual Transparency Review

Avri Doria

15 July 2013

Update: 10 August 2013

Update 130810

/Legitimacy/OutreachTemplate Draft - Legitimacy/outreach (Jorgen Abild Andersen)Jorgen Abild Andersen12 August 2013 
/FinancesTemplate Draft - Finances (Lise Fuhr)Lise Fuhr12 August 2013 

Work Streams Documents

WS 1

...

SSR Implementation Ealuation (16 August 2013)

WS3

WHOIS Implementation Status (16 August 29 September 2013)

WS4

Inventory of Observations and Potential Recommendations

Staff Responses

Archive:

ATRT2 Inventory of Observations & Potential Recommendations (Update 9 Sept).xlsx

ATRT2 Inventory of Observations & Potential Recommendations (Update31Aug)v.2.xlsx

...

ATRT2 Inventory of Observations & Potential Recommendations - Accountabilty Transparency (21Aug).xlsx

Index:

Index (19 September 2013)