Page History
...
Draft Report Structure | Draft | |
---|---|---|
FROZEN COMPILATION |
|
|
0. Summary | PLACEHOLDER | PLACEHOLDER |
| ||
6. Accountability Mechanisms 6.1 Description of overall accountability architecture | PLACEHOLDER | PLACEHOLDER |
6.2 Revised mission, commitments & core values 6.3 Fundamental Bylaws 6.4 Independent Review Panel Enhancements 6.7 Reconsideration Process Enhancements | 4-17 ICANN Mission - Frozen Draft.docx 4-17 Annotated Commitments and Core Values Language Frozen Draft.docx | FROZEN 4-17 ICANN Mission - Frozen Draft.pdf 4-17 Annotated Commitments and Core Values Language Frozen Draft[1].pdf |
6.6 Community Empowerment 6.6.1 Mechanism to empower the community: name of mechanism 6.6.2 Power: reconsider/reject budget or strategy / operating plans 6.6.3 Power: reconsider/reject changes to ICANN Bylaws 6.6.4 Power: Approve Changes to “Fundamental” Bylaws 6.6.5 Power: Recalling individual ICANN Directors 6.6.6 Power: Recalling the entire ICANN Board 6.7 Incorporating AoC into the ICANN Bylaws 6.7.1 Preserving ICANN Commitments from the AoC 6.7.2 AoC Reviews 6.8 Incorporating AoC into the ICANN Bylaws 6.8.1 Forcing the Board to respond to Advisory Committee formal advice 6.8.2 Require consultation and mutually acceptable GAC advice that is backed by consensus | 2015-04-17-WP1-firstcommentreport-content.docx
| 2015-04-17-WP1-firstcommentreport-content.pdf
|
7. Stress Tests | FROZEN | FROZEN |
8. Items for consideration in Work Stream 2 | FROZEN | FROZEN |
9. Implementation Plan including timing | PLACEHOLDER | PLACEHOLDER |
10. Set of questions for public comment | PLACEHOLDER | PLACEHOLDER |
...