AFRALO Monthly Teleconference
Date: Wednesday, 07 August 2013
Time: 18:30 - 19:30 UTC (For the time in various timezones click here)
Meeting Number: AL.AF/CC.12 BDB 0813/1
How can I participate in this meeting?
Comment participer a cette teleconference?
Adobe Connect room: http://icann.adobeconnect.com/afralo
Action Items: AFRALO Action Items EN 2013-08-07 , AFRALO Action Items FR 2013-08-07
Interpretation: French and English
Transcript: English, French
Recording: English , Francais
Adobe Connect Chat Room: AFRALO AC Chat Room transcript 2013-08-07
Adobe Connect Meeting Room: http://icann.adobeconnect.com/afralo
Participants:
EN: Adetokunbo Abiola (dial-out), Pastor Peters (dial-out)
FR: Baudouin Schombe (dial-out)
Apologies:
Staff: Silvia Vivanco, Heidi Ullrich, Gisella Gruber
Interpreters: Claire and Camilla
Call management: Nathalie Peregrine
A G E N D A (Français)
1. Appel 2’
2. Consultations Publiques Ouvertes - (Fatimata, Staff) 5’
Titres | Délais | ||
Période de Commentaire | Période de réponse | ||
| 12 Août | N/A | |
| 21 Juillet | 12 Août | |
| 25 Juillet | 16 Août | |
| Draft Final Report ccNSO Study Group on the Use of Country and Territory Names as TLDs | 1 Août | 30 Août |
| 8 Août | 29 Août | |
| 16 Août | 8 Septembre | |
| 16 Août | 8 Septembre | |
| 23 Août | 13 Septembre | |
| 28 Août | 18 Septembre | |
3. Rapports
a. Activités récentes et à venir de l'ALAC (Titi, Yaovi, Tijani) 5’
b. Activités récentes et à venir des membres d'AFRALO (tous) 5’
c. Rapport de la réunion de Durban (Aziz) 5’
4. Sujets pour Information
a. Formation virtuelle (Fatimata, Tijani) 5’
b. IGF Bali, Indonésie (Tijani) 5’
c. Groupe de Travail sur le second sommet At-Large (Tijani, Yaovi) 5’
d. Groupe de Travail sur la nouvelle stratégie des réunions d’ICANN (Tijani) 5’
5. Sujet pour discussion
a. Signature d’un accord cadre (MoU) avec AFRINIC (Fatimata) 5’
b. Nouvelle demande d’ALS de la part d’ISOC Nigéria (Fatimata, Aziz) 5’
6. Questions diverses (tous) 8’
A G E N D A (English)
1. Roll call 2’
2. Open Policy issues - (Fatimata, Staff) 5’
Title | Deadline | ||
Comment Period | Reply Period | ||
| 12 Aug. | N/A | |
| 21 July | 12 Aug. | |
| 25 July | 16 Aug. | |
| Draft Final Report ccNSO Study Group on the Use of Country and Territory Names as TLDs | 1 Aug. | 30 Aug. |
| 8 Aug. | 29 Aug. | |
| 16 Aug. | 8 Sep. | |
| 16 Aug. | 8 Sep. | |
| 23 Aug. | 13 Sep. | |
| 28 Aug. | 18 Sep. | |
3. Reports
a. Recent and upcoming Activities of ALAC (Titi, Yaovi, Tijani) 5’
b. Recent and upcoming Activities of AFRALO members (all) 5’
c. Report on Durban meeting (Aziz) 5’
4. Item for Information
a. Virtual capacity building (Fatimata, Tijani) 5’
b. IGF Bali, Indonesia (Tijani) 5
c. Working Group on the second At-Large Summit (Tijani, Yaovi) 5’
d. Meeting Strategy Working Group (MSWG) (Tijani) 5’
5. Item for discussion
a, Memorandum of Understanding with AFRINIC (Fatimata) 5’
b Application for a new ALS from ISOC Nigeria (Fatimata, Aziz) 5’
6. Any Other Business (all) 8’